Skip to content

Case Study · Crematories

Crematory High Emissivity Coating: 21% Energy Savings with Cremkote

Case study summary
IndustryCrematories
AssetCremation unit, main and afterburner chambers
Customer or locationCremation facility
Products usedCremkote®
Headline metric21% energy savings
Secondary metricFaster cycle times
Also measuredROI under one year
Also measured1,850°F (1,010°C), natural gas

A cremation facility applied Cremkote to the crown and walls of the main chamber and the walls of the afterburner chamber of its natural-gas cremation units, on refractory brick with the hearth left uncoated. Energy use fell 21%, cycle times shortened, and the project returned its cost in under a year.

01

What was the challenge?

Gas cost per cremation and cycle time on units operating at 1,850°F.

02

What was applied?

Cremkote on the main chamber crown and walls and the afterburner chamber walls; substrate firebrick and refractory brick; hearth not coated.

03

What were the results?

MetricBeforeAfter
Energy consumptionBaseline−21%
Cycle timeBaselineFaster
Return on investmentLess than one year

04

Why did it work?

Coated chamber surfaces absorb burner energy and re-radiate it uniformly into the chamber instead of losing it to the flue, so the unit reaches and holds temperature on less gas and completes each cycle sooner. See Crematories.

Next Step

Operators and OEMs: send us the unit make, caseload, and gas data.