01
The Challenge
Eastman wanted to evaluate energy savings and production gains from a high emissivity coating on an ethylene furnace operating at about 1,150°C.
02
What Was Applied
ST-series products on the IFB and Z-Blok modules, applied with a standard HVLP spray gun. New process tubes were installed concurrently.

03
Why It Worked
Improved radiative heat transfer from coated IFB and fiber and lower wall temperatures let the furnace crack more feed on less fuel. See Production Increase.
04
Summary of Results
| Metric | Before | After |
|---|---|---|
| Fuel consumption | Baseline | −6% |
| Ethylene production | Baseline | +9% |
| Payback | ~10 months (at US$6/MMBtu) | |
| Heating | Baseline | Improved uniformity, lower wall temperatures |