01
The Challenge
The operator wanted to improve the efficiency of an EDC cracking furnace operating at about 850°C while increasing cracking rates, with stable tube temperatures through extreme heat cycles.
02
What Was Applied
Emisshield M-2 on 40 process tubes; ST-3 and ST-17 on the ceramic fiber walls and burner blocks. A third party evaluated performance.

03
Why It Worked
Coated walls and blocks re-radiate into the coil while coated tubes absorb more of that energy, so the same firing cracks more feed. See Production Increase.
04
Summary of Results
| Metric | Before | After |
|---|---|---|
| Cracking rate | Baseline | +~10% |
| Energy savings | 2 to 6%, with reports exceeding 6% | |
| Production | Baseline | Production records set |
| Tube temperatures | Stable under extreme heat cycles |
Higher production per unit of energy led the client to coat two more furnaces.