Skip to content

Case Study · Power Generation

Burner Tip High Emissivity Coating: 7× Longer Life in a Black Liquor Recovery Boiler

Case study summary
IndustryPower Generation
AssetBlack liquor burner tips (stainless steel)
Customer or locationRecovery boiler
Products usedEmisshield sintered coating
Headline metricFirst degradation 3 weeks to 9 months
Secondary metricTime to failure 7 weeks to 12 months
Also measured7× life

Black liquor burners in a recovery boiler were corroding so fast that tips lasted less than two months, and replacing them meant significant plant downtime. Emisshield sintered coatings were applied to the stainless-steel burner tips. Time to first degradation rose from 3 weeks to 9 months and time to failure from 7 weeks to 12 months, a sevenfold increase, with maintenance and downtime cost cut significantly.

01

What was the challenge?

Rapid corrosion of burner tips and the difficulty of replacing them in service.

02

What was applied?

Sintered coating applied to the burner tips to minimize or eliminate degradation from temperature and corrosion.

03

What were the results?

MetricUncoatedCoated
Time to first degradation3 weeks9 months
Time to failure7 weeks12 months
LifespanBaseline
Maintenance and downtime costBaselineSignificantly reduced

04

Why did it work?

The sintered ceramic surface separates the alloy from the corrosive black-liquor environment while its emissivity keeps the tip cooler and more uniform. See Products, sintered systems.

Next Step

Replacing burner tips on a short cycle? Send us the burner type and service history.